N3 Design · Work

Corporate & Motion

Yamal | Arctic Transport Projects

Yamal, 2019

This presentation focuses on the large transport project that are being implemented into Russia today. The area of action is Yamal-Nenets Autonomous district. The main centres of oil and gas production are shifted here, in the coast and shelf of the Kara Sea. The task that was started 70 years ago by Stalinist construction site No. 501-503 became urgent again; it was the time to solve the problem by connecting the Northern and Svedlovsk railways, to ensure stable communication for internal transport networks with the seaport at the coast of the Arctic Ocean. This port is located in the village of Sabetta, and access to it is laid through the Northern latitudinal entrance (NLR) and the Arctic railway (NLR-2). The effects, capabilities and connections of these infrastructure projects with the future of the country need your attention to the screen.

Arctic Transport Projects

Sketches

Yamal infrastructure concepts: illuminated industrial towers and connecting transport systems.
Close-up of a futuristic infrastructure tower with cyan and magenta lighting. Overhead view of interconnected geometric infrastructure towers.
Novy Urengoy industrial cluster visualized on a regional map. Yamal gas production concept with a circular percentage chart.
Sabetta port and connecting transport routes on a 3D Arctic map. Arctic shipping routes connecting a cargo vessel to export markets.

Storyboard

Storyboard sheet introducing Yamal, railway infrastructure and regional geography.
Storyboard sheet showing gas production statistics and Arctic transport maps.
Storyboard sheet developing railway routes, port connections and logistics maps.
Storyboard sheet combining Arctic landscape footage and abstract infrastructure towers.
Storyboard sheet showing railway details, a regional map and a globe.

Infographics

Northern Latitudinal Railway route over an aerial winter landscape.
Line icon designs for railways, trains, pipelines, anchors and ships.
Yamal gas production statistics and industrial development graphics.
Northern Latitudinal Railway route map and key participant logos.
English and Russian graphic treatments for the Northern Latitudinal Railway and NLR-2.
Key project participants displayed with cyan and magenta graphic markers.
NLR-2 infographic with investment, freight and railway distance figures.
Arctic transport development infographic with capacity, costs and resource figures.
Multifunctional industrial cluster infographic with port, railway and pipeline connections.
2017 timeline graphic marking Sabetta Arctic port construction and LNG infrastructure.
2018 timeline graphic with sea port and liquefied natural gas facility markers.
Graphic elements for Yamal gas production and railway project statistics.
Timeline labels and project milestone graphics for Arctic transport infrastructure.

WIP

Work-in-progress 3D model of a dark freight wagon.
Work-in-progress 3D model of a red freight wagon.
Work-in-progress 3D model of a green open freight wagon.
Untextured 3D model of an Arctic cargo vessel.
Three work-in-progress views of a port and industrial transport network.
Dark Arctic coastline map with geographic outlines and transport nodes.

Credits

Installtechno Team

Film director
Ivan Sidelnikov
Shooting
Aleksey Kolodkin
Music & Sounddesign
Aleksey Lukin
Chief Editor
Valentina Gurkalenko
Management
Elena Sidelnikova

N3 Design Team

General Producer
Andrew Golikov
Project Manager
Sofia Sordokhonova
CG Supervisor
Andrey Kosogov
Concept Artist
Andrey Krasavin
CG Generalists
Dmitry Belov, Dmitry Yarkov, Anton Obmoin, Maxim Solovyev, Oleg Volokhov
TD VFX
Artyom Sokolov
Motion Designers
Maria Averina, Artem Rozanov
Graphic Designers
Anna Shkarina, Olga Vetrova, Ilya Nikolaev
Modelling Artist
Anton Turkin
Compositing Artist
Igor Samorodov
Next project: Rosneft 2019 · All work